Power Generation
WORK PERFORMED
- Emergency inspection of misaligned steel chimney liner
- Liner suspension & realignment
- Installation of interior & exterior reinforcement plating
- Replacement of corroded false floor
- Extension of false floor drainage system
- Roof beam reinforcement & bumper replacement
- Platform grating repairs
- Roof repair & coating
SUMMARY

TIME
Project completed in 6-7 weeks

COST
Most repairs completed during a scheduled outage

SAFETY
Completed safely with no reported incidents
CLIENT NEED
Steel liner with insulation removed
Corroded holes around the false floor
Liner leaning on the platform
ACCESS
SOLUTION
Rows of circumferential reinforcement plates installed
New false floor
New bumper plates
Liner re-insulated
False floor drainage extended
Roof coating complete
RESULTS